EFFECTIVELY LOGGING WELLS COMPLETED WITH SMALL / SLIM PRODUCTION LINERS
CHALLENGE: Most coiled tubing sidetrack wells within the up structure area of Greater Prudhoe Bay (GPB) field are competed with relatively small production liners (2-3/8” OD and 2-7/8” OD). These wells usually begin producing at very high Gas Oil Ratios (GOR) within a couple of years of being brought on line. The lateral length within […]